1
/
/
8
Royale Basic
Luxora pet GPS Tracker Collar - Real-Time Location Updates, Lightweight Design
Luxora pet GPS Tracker Collar - Real-Time Location Updates, Lightweight Design
常规价格
$10.80
常规价格
$75.95
促销价
$10.80
单价
/
单价
无法加载取货服务可用情况
Keep Your Feline Friend Safe and Sound
Ensure your cat's safety with our innovative GPS tracker that delivers real-time location updates directly to your smartphone. Experience peace of mind knowing your pet is always within reach, with precise tracking capabilities that keep you informed of their whereabouts effortlessly. The sleek, lightweight design allows for comfortable wear, and setup is a breeze, making it the perfect companion for your adventurous cat.
Features
- Real-time tracking: Instantly locate your cat from your smartphone.
- Compact design: Lightweight and comfortable for your pet.
- Easy setup: Attach and start tracking in minutes.
- Reliable performance: Accurate location data for peace of mind.
- Rechargeable battery: Long-lasting power for continuous use.

Specifications
- Material: ABS And Rubber
-
Adjustable Collar Circumference: 43 - 58cm
- GPS accuracy: 2 - 5m
- Total Collar Length: 65cm
- Battery life: Built-in 500mAh Li-ion Battery
- Usage environment: Indoor/Outdoor -20 - 55 Deg.C
- Package includes: 1 x GPS tracker for cats